国产精品一区二区久久国产抖音|中文字幕人妻有码无码视频|超虎粉嫩自慰观看新朋友|中文字幕不卡二区亚洲

您在使用過(guò)程,發(fā)現(xiàn)BUG通過(guò)在線問(wèn)題提交由開(kāi)發(fā)人員確定后,本站將會(huì)給予一個(gè)月廣告展示機(jī)會(huì)!
 位置:首頁(yè) -> 供求 -> 工程機(jī)械 -> 工程與建設(shè)  
10千瓦靜音柴油發(fā)電機(jī)如何啟動(dòng)
| 詳細(xì)信息  
柴油發(fā)電機(jī)組啟動(dòng)前的準(zhǔn)備:
1.檢查潤(rùn)滑油的油位、 冷卻液液位、燃油量;
2.檢查柴油機(jī)的供油、潤(rùn)滑、冷卻等系統(tǒng)各個(gè)管路及接頭有無(wú)漏油漏水現(xiàn)象;
3.檢查電氣線路有無(wú)破皮等漏電隱患,接地線電氣線路是否松動(dòng),機(jī)組與基礎(chǔ)的連接是否牢固;
4.若環(huán)境溫度低于零度時(shí),須在散熱器內(nèi)添加一定比例的防凍劑;
5.柴油發(fā)電機(jī)組次啟動(dòng)或停機(jī)較長(zhǎng)時(shí)間后再次啟動(dòng),應(yīng)先用手壓泵排盡燃油系統(tǒng)內(nèi)的空氣。


【品牌名稱】:豹羅動(dòng)力
【銷售經(jīng)理】:宋經(jīng)理
【聯(lián)系電話】:18019419802(同微信)
【直線座機(jī)】:021-51987469
【電子郵箱】:1736462533@qq.com
【公司名稱】:上海豹羅實(shí)業(yè)有限公司
【在線QQ】:1736462533
【公司地址】:上海嘉定區(qū)葉城路818號(hào)




啟動(dòng):
1.合上控制箱內(nèi)的保險(xiǎn)后,按啟動(dòng)按鈕,按下按鈕3~5s,若啟動(dòng)不成功,應(yīng)等20s左右再次啟動(dòng)。若多次啟動(dòng)不成功,應(yīng)停止啟動(dòng)操作,排除電瓶電壓或油路等故障因數(shù)后,再次啟動(dòng);
2.啟動(dòng)時(shí)應(yīng)觀察幾油壓力,若油壓無(wú)顯示或很低時(shí),應(yīng)立即停車檢查。
運(yùn)行:
1.機(jī)組啟動(dòng)后,檢查控制箱模塊各項(xiàng)參數(shù);機(jī)油壓力、 水溫、電壓、頻率等;
2.通常情況下,機(jī)組啟動(dòng)后轉(zhuǎn)速直接達(dá)到額定轉(zhuǎn)速;有怠速要求的機(jī)組,怠速時(shí)間一般為3~5min,怠速時(shí)間不易過(guò)長(zhǎng),否則可能燒壞發(fā)電機(jī)相關(guān)元器件;
3.檢查機(jī)組油路、水路及電器的滲漏情況;
4.檢查機(jī)組各連接處的緊固情況,看有無(wú)松動(dòng)和劇烈振動(dòng);
5.觀察機(jī)組各種保護(hù)和監(jiān)視裝置是否正常;
6.當(dāng)轉(zhuǎn)素達(dá)到額定轉(zhuǎn)速,起空載運(yùn)行的各項(xiàng)參數(shù)穩(wěn)定后,合閘供電;
7.檢查確認(rèn)控制屏各項(xiàng)參數(shù)是否在允許的范圍內(nèi),再次檢查機(jī)組的振動(dòng),有無(wú)三漏及其他故障;
8.機(jī)組運(yùn)行時(shí)嚴(yán)禁超載。
正常停機(jī):
停機(jī)前必須先分閘, 一般情況卸載后需運(yùn)行3~5min停機(jī)。
緊急停機(jī):
1.發(fā)電機(jī)組運(yùn)轉(zhuǎn)出現(xiàn)異常情況時(shí),必須立即停機(jī);
2.緊急停機(jī)時(shí),按下急停按鈕或?qū)娪捅猛C(jī)控制手柄迅速推倒停車位置。
保養(yǎng)事項(xiàng):
1.柴油機(jī)濾芯更換時(shí)間為300H;空氣濾芯更換時(shí)間為每400H;機(jī)油濾芯次更換時(shí)間為50H,以后為250H。
2.機(jī)油次更換時(shí)間為50H,以后機(jī)油正常更換時(shí)間為每250H。








How to start the 10 kW silent diesel generator
Preparation of a diesel generating set before starting:
1. check the oil level, coolant level and fuel volume of the lubricating oil.
2. check whether there is leakage or leakage of oil and lubricating oil and cooling system in the diesel engine.
3. check whether there is leakage hazard such as broken electrical wiring, whether the electrical wiring of the grounding wire is loose, and whether the connection between the unit and the foundation is solid.
4. if the ambient temperature is below zero, a certain proportion of antifreeze should be added to the radiator.
5. diesel engine generator start or stop after a long time to start again, should first use the hand pump to exhaust the air in the fuel system.


brand name: Leopard power
sales manager: manager of song
contact: 18019419802 (with WeChat)
linear machine: 021-51987469
E mailbox: 1736462533@qq.com
Company name: Shanghai leopard Industry Co., Ltd.
online QQ: 1736462533
company address No. 818 Yecheng Road, Jiading District, Shanghai.




Start:
1. close the control box's insurance, press the start button, press the button 3~5s, if the start is not successful, wait for 20s to start again. If multiple start-up fails, the operation should be stopped and the fault factors such as battery voltage or oil circuit should be removed.
2. several oil pressure should be observed when starting. If the oil pressure is not shown or very low, stop checking immediately.
Function:
1. after the unit starts, check the parameters of the control module, oil pressure, water temperature, voltage, frequency, etc.
2. normally, the speed of the unit is directly rated as the speed of the set. The idle speed is generally 3~5min and the idle time is not easy to be too long, otherwise the generator related components may be burned.
3. check the leakage of oil, water and electrical equipment.
4. check the fastening position of each connection point to see if there is loose or violent vibration.
5. observe whether the various protection and monitoring devices are normal.
6. when the converter reaches the rated speed, the various parameters of the no-load operation will be stabilized and the power supply will be closed.
7. check to see if the parameters of the control panel are in the allowed range, check the vibration of the unit again, whether there are three leakage and other faults.
Overloading of the 8. unit is strictly prohibited.
Normal shutdown:
Before shutting down, it is necessary to divide the gate first. After the general condition is unloaded, it is necessary to run 3~5min to stop.
Emergency shutdown:
1. generator units must be shut down immediately when abnormal operation occurs.
2. when the emergency shutdown is stopped, press the emergency stop button or push the fuel pump stop control handle to push the parking position down quickly.
Maintenance items:
1. diesel engine cartridge replacement time is 300H; air filter replacement time for each 400H; oil filter core replacement time is 50H, later for 250H.
2. oil sub replacement time is 50H, after the normal oil replacement time is 250H each.



網(wǎng)站首頁(yè) - 關(guān)于我們 - 使用協(xié)議 - 免責(zé)條款 - 版權(quán)隱私 - 網(wǎng)站地圖 - 友情鏈接 - 廣告服務(wù) - 會(huì)員服務(wù) - 免費(fèi)注冊(cè) - 聯(lián)系方式
問(wèn)題請(qǐng)通過(guò)在線提問(wèn)反饋 | 在線客戶QQ:105452034 | 收費(fèi)會(huì)員及廣告咨詢電話13332201705 技術(shù)支持:遼寧衡駿節(jié)能科技有限公司
Copyright 2007- dbzz.net All Rights Reserved 東北制造網(wǎng)(東北地區(qū)唯一制造業(yè)網(wǎng)上平臺(tái)) 版權(quán)所有 遼ICP備2021008091號(hào) 遼公網(wǎng)安備21021702000105
為獲得最佳瀏覽效果,建議使用IE7以上,或Firefox7以上瀏覽器
經(jīng)營(yíng)性網(wǎng)站
備案信息
百?gòu)?qiáng)網(wǎng)站
誠(chéng)信聯(lián)盟
網(wǎng)絡(luò)110
報(bào)警服務(wù)
不良信息
舉報(bào)中心